Font: (-) / (+)

Parks & Golf Operations Center Update

February 13, 2018 – Over the past month, work continued on the exterior of the building including installation of the guardrail along the east side of the parking lot, installation of the overhead doors and testing of the fuel tanks. Interior work included 
 hanging the doors and ceiling grid a well as installation of the light fixtures, lockers,
signage, blinds and restroom fixtures. The stairway, elevator and cabinetry in the training room and door hardware are being installed and will be completed by week’s end.
Inspections began and will continue over the next week. Ceiling tiles will be installed once inspections are completed.

Upcoming work will include installation of the mesh partitions, sliding fence gate and
chemical wash station.