Will the paths remain open during construction?

October 28, 2024

Yes. Most of the paths will remain open during construction, including the southernmost path connecting Ridge Road to Red Oak Lane. The pathway section adjacent to the south parking lot and existing ballfield will be closed. This path will be the front of the new building.