Tue, Sept 3 – Centennial Ice Arena Update: Over the next two weeks, contractors will work in the Centennial Ice Arena parking lot to correct a construction error on the west side ADA parking spaces. The building, turn-around, the remainder of the parking lot including the two ADA parking spaces on the south side of the lot remain open during construction.

Have there been any tests for chemical emissions from the fill materials? Who conducted the tests? What were the results?

March 22, 2024

Toxicology tests were done on EPDM (ethylene propylene, diene monomer) by an independent lab using the EPA Method 6010 standard – testing for the presence of heavy metals, hydrocarbons, and phthalates(fal-ates).   No harmful emissions were found.